Most load bearing walls come out in one day of work. From your first call to a finished, inspected opening, plan on [X–Y weeks — to confirm], because engineering and the city permit come first. Here is every step, in order, so you know what happens and when.
Step 1: Photos and a first answer
Text photos of the wall, both sides, and the attic above it to (469) 436-5680. From photos we can usually tell whether the wall is load bearing and give you a ballpark price.
Step 2: On-site estimate
We visit to measure the opening, look in the attic, check what runs inside the wall and talk about how you want the finished space to look, including whether you want a flush or dropped beam. You get a written price before anything is scheduled.
Step 3: Engineering
A licensed engineer designs the beam, the posts and any footing the house needs. This usually takes [a few days — to confirm].
Step 4: Permit
We file the permit with the engineer’s plan. Review times vary by city. [Typical review time — to confirm] Read more in our guide to permits for load bearing wall removal.
Step 5: Prep
On the work day we protect floors along the path, seal the work area with plastic to contain dust and turn off any utilities that run through the wall. Most families stay home.
Step 6: Temporary shoring
Before the wall is touched, we build temporary walls on both sides to hold the ceiling or the floor above. This is what keeps the house from moving while the wall is out.
Step 7: The wall comes out
Drywall, studs and top plates are removed. Any wiring, plumbing or ductwork in the wall is rerouted as planned.
Step 8: Beam and posts go in
The new beam is set, either up into the ceiling for a flush beam or below it for a dropped beam, and the posts carry its ends down to the foundation. Joist hangers and connections are installed per the engineer’s plan. Only then do the temporary walls come down.
Step 9: Framing inspection
The city inspector checks the framing against the engineer’s plan before the ceiling is closed. We schedule and meet the inspector.
Step 10: Finish patch
We patch the ceiling and the floor where the wall stood, tape, mud and texture the drywall so the opening is ready for paint. Drywall finishing can take [one to three days — to confirm] because each coat has to dry.
Step 11: Final inspection and cleanup
A final inspection closes the permit. You get the paperwork for your records and our 12-year written, transferable warranty.
What can make it take longer
City review times, especially in busy months.
Rerouting inside the wall, like a gas line or a vent stack.
New footings, which need concrete to cure.
Long spans or steel beams that need to be ordered.
Raising the ceiling at the same time.
Planning around a remodel
If you are remodeling a kitchen, do the wall first. The beam, ceiling patch and rerouted utilities need to be done before cabinets, countertops and flooring go in. Ready to start? See our load bearing wall removal service or call (469) 436-5680.