You can raise a ceiling when there is usable space between the ceiling and the roof and the roof framing can be changed safely. In homes with hand-framed rafters, that usually means removing or relocating ceiling joists and adding beams or ties the engineer designs. In homes with trusses, the trusses themselves have to be modified or replaced, which is a bigger job. A raised ceiling always needs an engineer and a permit.
Why raise a ceiling
Many Dallas–Fort Worth homes have 8-foot ceilings under a steep roof with plenty of space above. Raising the ceiling makes a room feel much larger without adding square footage, brings in more light and pairs well with an open floor plan. Some homeowners raise only the living room; others raise the kitchen to match a family room that is already vaulted.
Raised, vaulted or tray?
Raised flat ceiling: the whole ceiling moves up to a new, higher flat plane.
Tray ceiling: the center of the ceiling steps up, leaving a lower border around the edges.
Vaulted or cathedral ceiling: the ceiling follows the slope of the roof. Read our guide to vaulting a ceiling.
Rafters vs. trusses
What is above your ceiling decides the plan:
Rafters and ceiling joists. Common in older homes. The ceiling joists also tie the walls together so the roof doesn’t spread. They can be moved up or replaced with a ridge beam or collar ties, as the engineer designs.
Trusses. Common in homes built from the 1980s on. Each truss is a single engineered unit, so it can’t be cut. Raising the ceiling means replacing trusses or adding new framing, which the engineer and often the truss manufacturer design.
What changes in the attic
Raising a ceiling uses the space where ductwork, wiring, insulation and sometimes the HVAC unit live. All of it has to be moved or rerouted. Insulation is replaced at the new ceiling line, and the room may need more cooling once its volume grows.
The project, step by step
Attic inspection to see the framing, ducts and wiring.
Engineering for the new framing, beams and ties.
Permit filed with the engineer’s plan.
Shoring and removal of the old ceiling and joists.
New framing per the plan, then inspection.
Rerouting of ducts, wiring and lighting.
Insulation and drywall, then texture and paint.
Combining it with wall removal
Raising a ceiling is often done with a wall removal, so the new open space is also taller. Doing both at once saves time, because the shoring, engineering and permit cover both. In Frisco, one of our projects turned a flat, closed layout into a tall open space with exposed wood beams; see it in our gallery.
What affects the price
Rafters or trusses above the ceiling.
How much area is raised.
Ductwork and HVAC equipment that has to move.
Exposed beams or a plain drywall finish.
Lighting for the new ceiling.
We give a written price after the attic inspection. [Typical price range — to confirm]
Start with photos of the attic
Text photos of the room and the attic above it to (469) 436-5680, and we will tell you what your framing allows. Learn more on our raised and vaulted ceilings page.
Text photos of your wall and talk to a real person. Licensed engineer on every job, permit handled, lifetime structural warranty.